54900 Romeo Plank Road, Macomb, MI 48042 Mon–Fri 9am–6pm · Sat 8am–2pm
Home All Services Kitchen Remodeling Bathroom Remodeling Basement Remodeling Our Process Portfolio About Us Our Team Reviews Service Areas Financing FAQ Contact & Booking

Eight Phases. Zero Surprises. From First Call to Final Walkthrough.

Every BrightForge project follows the same disciplined sequence — so you always know what's happening, what's next, and what it costs.

The Complete Journey

What Happens From the Day You Call to the Day We Hand Back the Keys

Each phase has clear deliverables, defined responsibilities, and a written checkpoint you sign off on before we move forward.

01
Day 0–1

Discovery Call

Twenty minutes on the phone with a BrightForge project coordinator. We ask about your goals, your timeline, your budget range, and the current state of the space. No pressure, no sales script — just an honest conversation to confirm we're a good fit for each other.

What We Ask

Room dimensions, current layout issues, budget range, and target start date.

What You Get

A ballpark investment range and a scheduled in-home consultation date.

Scheduled in-home consultation
02
Week 1

In-Home Measure & Design Consultation

Your project manager and designer visit your home — typically 90 minutes. We measure every wall, check framing, photograph the space, and review material samples on site. This is where ideas start to become a real plan.

Who Attends

Your project manager, a designer, and (for kitchens) our cabinetry lead.

What We Bring

Material samples, appliance catalogs, and a tablet with our 3D design software.

Measured drawings and design direction
03
Week 2–3

Design Development & Fixed Proposal

We build out your design in 3D, refine material selections, and prepare a line-item proposal with fixed pricing. Every labor hour, every material, every permit fee is documented. You'll know exactly what you're paying for before you sign anything.

3D Renderings

Two design revisions included. Additional revisions are billed hourly at a published rate.

Fixed Pricing

Once you sign, that's the number. Change orders only happen if you request them.

Signed contract and locked schedule
04
Week 3–5

Pre-Construction & Permits

We file all required permits with your municipality, schedule inspections, order long-lead materials (cabinets, stone, appliances), and confirm delivery dates. You receive a written schedule with week-by-week milestones before demolition begins.

Permits Filed

Building, electrical, plumbing, and mechanical — all pulled together under one application.

Materials Ordered

Cabinets, stone, tile, and appliances confirmed with delivery dates in hand.

Permits approved, materials ordered, schedule confirmed
05
Build Week 1

Demolition & Site Preparation

Careful demolition with floor protection, plastic dust barriers, and a dedicated debris container. We remove all old materials, inspect framing and subfloor, and document any hidden issues before proceeding. If we find a surprise, we stop and discuss it with you the same day.

Dust Control

Zip-wall barriers, HEPA air scrubbers, and daily site cleanup.

Hidden Issues

Any unexpected structural or moisture issue is documented and priced before we continue.

Clean, prepped, ready-for-rough-in site
06
Build Week 2–4

Rough-In: Plumbing, Electrical, HVAC

All mechanical work happens now, before any wall closes. New circuits, relocated drains, extended HVAC, ventilation, and framing adjustments. Every rough-in is inspected by your municipality before we insulate and drywall.

Electrical

Dedicated circuits, GFCI protection, and code-compliant panel work.

Plumbing

Relocated supply and drain lines, pressure-tested before walls close.

HVAC

Supply and return extended, ventilation sized to code, exhaust ducted to exterior.

Rough-in inspections passed
07
Build Week 4–7

Finishes: Drywall, Tile, Cabinets, Fixtures

The visible transformation. Insulation, drywall, primer, paint, flooring, tile, cabinetry, countertops, and every fixture installed in sequence. This is the longest phase and where daily photo updates matter most.

Waterproofing

Membrane, shower pan, and niche details installed before any tile goes up.

Cabinetry

Set and leveled, countertops templated and installed with hidden seams.

Fixtures

Sinks, faucets, toilets, lighting, and hardware installed and tested.

Space begins looking like the finished room
08
Final Week

Punch List, Walkthrough & Handoff

We walk the finished space together, room by room. You point out anything that isn't right; we document it and fix it. Only when you're satisfied do we close the project. Final invoices are due 7 days after your sign-off, not before.

Punch List

Any item you flag is corrected within 5 business days — at our cost.

Documentation

You receive warranty info, care guides, and receipts for all registered appliances.

Follow-Up

We check in at 30 days and 12 months to confirm everything still works as promised.

Signed handoff and 5-year workmanship warranty
Client Portal

Follow Every Phase From Your Phone

No wondering what's happening today. Your project portal shows real-time progress, photos, and messages — updated every working day.

Your Project, Live

Every BrightForge client gets a personal project portal with daily updates, photos, schedules, and direct messaging with their project manager.

Kitchen Remodel · Troy, MI
Phase 5 · DemolitionComplete
Phase 6 · Rough-InIn Progress
Phase 7 · FinishesScheduled
Phase 8 · HandoffScheduled

What You Can Do in the Portal

  • See daily photo updates from your project manager — no need to call and ask how it's going.
  • Message your project manager directly. Responses within one business hour during work days.
  • View your live schedule, upcoming milestones, and any change to the timeline.
  • Access every invoice, receipt, and warranty document in one place.
  • Approve change orders digitally — no printing, no scanning, no trips to the office.
Our Promises

Four Commitments We Put in Writing

These aren't marketing slogans. They're contract clauses you can hold us to.

Fixed Price

Once you sign, the price doesn't change unless you request a scope change. Materials market fluctuations, labor overruns, and permit delays are our problem — not yours.

Written Schedule

You receive a week-by-week schedule before demolition begins. If we fall behind for any reason, we notify you the same day and present a recovery plan.

Clean Site Daily

Every workday ends with a swept site, secured tools, and any debris removed. Your home stays livable throughout the project.

Satisfaction Clause

If any part of the work doesn't match the approved scope, we fix it at our cost. No arguments, no nickel-and-diming. This clause is in every BrightForge contract.

Week by Week

What a Typical Week Looks Like

Every project is different, but our weekly rhythm stays consistent. Here's what you can expect while construction is active.

Monday
Week Kickoff

Your project manager confirms the week's plan, trade schedule, and any decisions you need to make by Wednesday.

Tuesday–Thursday
Active Work Days

Crews work 8am–4:30pm. You receive daily photo updates by 6pm via the portal.

Friday Morning
Walkthrough

Your project manager walks the site with you, reviews what was accomplished, and previews next week.

Friday Afternoon
Site Reset

Deep clean, tool inventory, and secure the site for the weekend. No crew on site Saturday or Sunday unless scheduled in advance.

Questions About the Process

What Homeowners Ask Most Often

For a typical kitchen or bathroom: 8–14 weeks total, including 3–4 weeks of design and permitting plus 4–10 weeks of construction. Basements run 10–16 weeks total. We'll give you a specific timeline in your proposal.

Change orders are permitted any time before the affected work begins. You'll see the labor, materials, and schedule impact before you approve anything. If the change is minor, we usually absorb it. If it's substantial, we price it transparently.

No. Most clients are at work during the day. We ask that you're reachable by phone for decisions and available for the Friday walkthrough. If you need to be home, that's fine too — we keep the site clean and respectful.

Small changes like paint colors, hardware, or light fixture selections can often be made mid-project. Structural changes or cabinet modifications after order are usually expensive and slow — that's why we lock in the design before ordering.

Tell your project manager immediately. If the issue isn't resolved, escalate to our Client Experience Manager — she's independent of the construction team. Our contract includes a satisfaction clause requiring us to correct any work that doesn't match the approved scope at our cost.

You receive a 5-year workmanship warranty on all labor plus manufacturer warranties on all materials. We schedule a 30-day check-in and a 12-month follow-up to confirm everything still works as promised.

See All FAQs

See the Process in Person.

Book a free consultation and we'll walk your space, discuss the phases that matter most for your project, and give you honest numbers.